Blog

Jan 28, 2026

The Case for Battery Monitoring

Data centers rely on batteries as a critical backup power source, but traditional battery maintenance and replacement strategies can lead to unnecessary costs, operational risks, and inefficient use of battery lifespan. Battery Monitoring Systems (BMS) provide a smarter alternative by delivering real-time insights into battery health, extending service life, and optimizing replacement cycles.

Learn More
Jan 14, 2026

Data Center Critical Power Asset Monitoring

By leveraging the advanced monitoring solutions offered by Franklin Electric, data center personnel can achieve the highest levels of reliability and efficiency. From UPS systems and battery monitoring, to energy asset management, Franklin Electric provides a holistic approach to power management, ensuring that data centers remain operational, even in the face of unexpected power disruptions.

Learn More
Dec 29, 2025

The Benefits of Online Circuit Breaker Monitoring

Learn how online circuit breaker monitoring helps utilities improve reliability and reduce maintenance costs. With continuous insight into breaker timing, mechanical performance and SF6 conditions, the INCON® Optimizer3 can identify emerging issues earlier. This reduces the need for offline testing and helps teams target maintenance more effectively while limiting truck...

Learn More
Dec 03, 2025

Extend Circuit Breaker Life

The INCON® Optimizer3 facilitates condition-based maintenance, allowing maintenance to be performed based on the actual condition of the circuit breaker rather than on a fixed schedule. This targeted approach prevents unnecessary maintenance, reducing the risk of over-maintenance that can contribute to premature wear.

Learn More
Jan 28, 2025

Streamlining Circuit Breaker Maintenance Across a Substation Network

A major utility in the western United States manages a wide range of high voltage circuit breakers in their substations. Circuit breakers including oil, SF6, and vacuum types from various manufacturers are employed throughout their network of substations. Each circuit breaker type presents unique monitoring needs, making it challenging for...

Learn More
Nov 19, 2024

Deep Dive: Circuit Breaker Timing

Once connected to the breaker’s control circuit, the Optimizer3 Circuit Breaker Monitor will take timing measurements each time the breaker operates. The availability and fidelity of these timing measurements enable utilities to defer or eliminate off-line testing.

Learn More
Sep 04, 2024

Part 5: Equipment Selection

You can generally look to a few electrical specifications of the selected chargers to appropriately size the required switchgear. A good place to start is to figure out the required circuit breaker sizes to be included in the switchgear. You will need to figure out what you need for both the individual branch circuit breakers for each charger and the main circuit breaker.

Learn More
Jul 16, 2024

Key Components of DC Fast Charging Stations

People new to the Electric Vehicle (EV) industry may find the DC fast charging ecosystem complex. Let's examine the required equipment, utility infrastructure, and the process of charging an EV with a DC fast charger.

Learn More